Shilshole 12Mar14 * SG210 * Dive index * Mission links
Based on low voltage useage over previous 10 dives:
    dives remaining   : 1040 (39.3 days at current dive duration)
    projected end date: 21-Apr-2014 23:17:49 (to 15% capacity)

Based on high voltage useage over previous 10 dives:
    dives remaining   : 1345 (50.9 days at current dive duration)
    projected end date: 03-May-2014 12:06:35 (to 15% capacity)

High voltage pack usage


Low voltage pack usage