Shilshole 04Mar14 * SG210 * Dive index * Mission links
Based on low voltage useage over previous 1 dives:
    dives remaining   : 7173 (97.4 days at current dive duration)
    projected end date: 10-Jun-2014 04:47:37 (to 15% capacity)

Based on high voltage useage over previous 1 dives:
    dives remaining   : 10274 (139.5 days at current dive duration)
    projected end date: 22-Jul-2014 07:12:10 (to 15% capacity)

High voltage pack usage


Low voltage pack usage