WA coast Aug21 * SG204 * Dive index * Mission links
Based on high voltage usage over previous 9 dives:
    dives remaining   : 635 (41.8 days at current dive duration)
    projected end date: 10-Oct-2021 07:03:21 (to 15% capacity)

Based on low voltage usage over previous 9 dives:
    dives remaining   : 1154 (75.9 days at current dive duration)
    projected end date: 13-Nov-2021 10:08:49 (to 15% capacity)

High voltage pack usage


Low voltage pack usage