WA coast 30Aug21 * SG204 * Dive index * Mission links
Based on high voltage usage over previous 11 dives:
    dives remaining   : 721 (36.9 days at current dive duration)
    projected end date: 21-Oct-2021 11:06:21 (to 15% capacity)

Based on low voltage usage over previous 11 dives:
    dives remaining   : 1302 (66.5 days at current dive duration)
    projected end date: 20-Nov-2021 03:48:55 (to 15% capacity)

High voltage pack usage


Low voltage pack usage