Shilshole 13Nov14.01 * SG203 * Dive index * Mission links
Based on low voltage useage over previous 2 dives:
    dives remaining   : 1009 (21.9 days at current dive duration)
    projected end date: 06-Dec-2014 16:18:41 (to 15% capacity)

Based on high voltage useage over previous 2 dives:
    dives remaining   : 2482 (53.8 days at current dive duration)
    projected end date: 07-Jan-2015 14:40:50 (to 15% capacity)

High voltage pack usage


Low voltage pack usage