Shilshole 03May22 * SG203 * Dive index * Mission links
Based on high voltage usage over previous 5 dives:
    dives remaining   : 1161 (34.9 days at current dive duration)
    projected end date: 07-Jun-2022 20:37:10 (to 15% capacity)

Based on low voltage usage over previous 5 dives:
    dives remaining   : 1576 (47.4 days at current dive duration)
    projected end date: 20-Jun-2022 08:26:02 (to 15% capacity)

High voltage pack usage


Low voltage pack usage