Shilshole 14Feb17 * SG202 * Dive index * Mission links
Based on high voltage useage over previous 5 dives:
    dives remaining   : 1649 (56.0 days at current dive duration)
    projected end date: 11-Apr-2017 22:31:27 (to 15% capacity)

Based on low voltage useage over previous 5 dives:
    dives remaining   : 1798 (61.1 days at current dive duration)
    projected end date: 17-Apr-2017 00:01:02 (to 15% capacity)

High voltage pack usage


Low voltage pack usage