Shilshole 19Jul19 * SG197 * Dive index * Mission links
Based on low voltage useage over previous 5 dives:
    dives remaining   : 525 (18.9 days at current dive duration)
    projected end date: 07-Aug-2019 18:08:02 (to 15% capacity)

Based on high voltage useage over previous 5 dives:
    dives remaining   : 1518 (54.6 days at current dive duration)
    projected end date: 12-Sep-2019 10:55:38 (to 15% capacity)

High voltage pack usage


Low voltage pack usage