Shilshole 04Jun14 * SG196 * Dive index * Mission links
Based on high voltage useage over previous 2 dives:
    dives remaining   : 1638 (615.0 days at current dive duration)
    projected end date: 09-Feb-2016 18:03:23 (to 15% capacity)

Based on high voltage useage over previous 2 dives:
    dives remaining   : 1638 (615.0 days at current dive duration)
    projected end date: 09-Feb-2016 18:03:23 (to 15% capacity)

High voltage pack usage


Low voltage pack usage