Shilshole 13Dec17 * SG195 * Dive index * Mission links
Based on high voltage useage over previous 5 dives:
    dives remaining   : 997 (25.9 days at current dive duration)
    projected end date: 08-Jan-2018 20:11:52 (to 15% capacity)

Based on low voltage useage over previous 5 dives:
    dives remaining   : 1194 (31.0 days at current dive duration)
    projected end date: 13-Jan-2018 23:06:14 (to 15% capacity)

High voltage pack usage


Low voltage pack usage