Shilshole 22Aug12 * SG189 * Dive index * Mission links
Based on low voltage useage over previous 2 dives:
    dives remaining   : -1236 (-30.0 days at current dive duration)
    projected end date: 23-Jul-2012 18:35:49 (to 5% capacity)

Based on high voltage useage over previous 2 dives:
    dives remaining   : -894 (-21.7 days at current dive duration)
    projected end date: 01-Aug-2012 02:08:40 (to 5% capacity)

High voltage pack usage


Low voltage pack usage