ITOP Sep10 * SG182 * Dive index * Mission links
Based on low voltage useage over previous 10 dives:
    dives remaining   : 525 (22.9 days at current dive duration)
    projected end date: 01-Nov-2010 02:15:49 (to 5% capacity)

Based on high voltage useage over previous 10 dives:
    dives remaining   : 990 (43.1 days at current dive duration)
    projected end date: 21-Nov-2010 08:16:45 (to 5% capacity)

High voltage pack usage


Low voltage pack usage