SMODE Apr23 *
SG180 *
Dive index
* Mission links
Based on high voltage usage over previous 10 dives:
dives remaining : 435 (67.8 days at current dive duration)
projected end date: 12-Sep-2023 08:41:42 (to 15% capacity)
Based on high voltage usage over previous 10 dives:
dives remaining : 435 (67.8 days at current dive duration)
projected end date: 12-Sep-2023 08:41:42 (to 15% capacity)
Based on fuel gauge from combined packs over previous 10 dives:
dives remaining : 141 (21.9 days at current dive duration)
projected end date: 28-Jul-2023 13:14:15 (to 15% capacity)
High voltage pack usage
Low voltage pack usage