Shilshole 31May12 * SG179 * Dive index * Mission links
Based on low voltage useage over previous 4 dives:
    dives remaining   : 1130 (25.3 days at current dive duration)
    projected end date: 26-Jun-2012 04:08:22 (to 5% capacity)

Based on high voltage useage over previous 4 dives:
    dives remaining   : 1414 (31.6 days at current dive duration)
    projected end date: 02-Jul-2012 12:31:59 (to 5% capacity)

High voltage pack usage


Low voltage pack usage