Shilshole 27Aug14 * SG179 * Dive index * Mission links
Based on low voltage useage over previous 5 dives:
    dives remaining   : 858 (18.7 days at current dive duration)
    projected end date: 15-Sep-2014 13:30:59 (to 15% capacity)

Based on high voltage useage over previous 5 dives:
    dives remaining   : 2054 (44.8 days at current dive duration)
    projected end date: 11-Oct-2014 15:49:18 (to 15% capacity)

High voltage pack usage


Low voltage pack usage