AUTEC Jun10 * SG178 * Dive index * Mission links
Based on low voltage useage over previous 10 dives:
    dives remaining   : 238 (20.4 days at current dive duration)
    projected end date: 02-Jul-2010 01:41:30 (to 5% capacity)

High voltage pack usage


Low voltage pack usage