Shilshole 26Jan12 * SG017 * Dive index * Mission links
Based on high voltage useage over previous 4 dives:
    dives remaining   : 996 (24.6 days at current dive duration)
    projected end date: 20-Feb-2012 12:59:33 (to 5% capacity)

Based on low voltage useage over previous 4 dives:
    dives remaining   : 2205 (54.4 days at current dive duration)
    projected end date: 21-Mar-2012 08:49:16 (to 5% capacity)

High voltage pack usage


Low voltage pack usage