OKMC Apr12 * SG169 * Dive index * Mission links
Based on high voltage useage over previous 10 dives:
    dives remaining   : 158 (15.2 days at current dive duration)
    projected end date: 24-Aug-2012 02:02:29 (to 5% capacity)

Based on low voltage useage over previous 10 dives:
    dives remaining   : 358 (34.5 days at current dive duration)
    projected end date: 12-Sep-2012 08:18:49 (to 5% capacity)

High voltage pack usage


Low voltage pack usage