Shilshole 08Aug12 * SG167 * Dive index * Mission links
Based on high voltage useage over previous 4 dives:
    dives remaining   : 0 (0.0 days at current dive duration)
    projected end date: 09-Aug-2012 23:34:04 (to 5% capacity)

Based on high voltage useage over previous 4 dives:
    dives remaining   : 0 (0.0 days at current dive duration)
    projected end date: 09-Aug-2012 23:34:04 (to 5% capacity)

High voltage pack usage


Low voltage pack usage