OKMC Aug12 * SG166 * Dive index * Mission links
Based on high voltage useage over previous 10 dives:
    dives remaining   : 111 (27.6 days at current dive duration)
    projected end date: 30-Sep-2012 05:21:55 (to 5% capacity)

Based on low voltage useage over previous 10 dives:
    dives remaining   : 461 (114.5 days at current dive duration)
    projected end date: 26-Dec-2012 03:43:30 (to 5% capacity)

High voltage pack usage


Low voltage pack usage