QPE May09 * SG165 * Dive index * Mission links
Based on high voltage useage over previous 10 dives:
    dives remaining   : 4 (0.8 days at current dive duration)
    projected end date: 10-Sep-2009 17:46:47 (to 5% capacity)

High voltage pack usage


Low voltage pack usage