Shilshole 01Jul15.01 * SG163 * Dive index * Mission links
Based on high voltage useage over previous 3 dives:
    dives remaining   : 1078 (29.1 days at current dive duration)
    projected end date: 30-Jul-2015 23:15:32 (to 15% capacity)

Based on low voltage useage over previous 3 dives:
    dives remaining   : 1777 (47.9 days at current dive duration)
    projected end date: 18-Aug-2015 19:43:55 (to 15% capacity)

High voltage pack usage


Low voltage pack usage