Shilshole 15Apr14 * SG161 * Dive index * Mission links
Based on high voltage useage over previous 10 dives:
    dives remaining   : 976 (46.2 days at current dive duration)
    projected end date: 01-Jun-2014 21:02:58 (to 15% capacity)

Based on low voltage useage over previous 10 dives:
    dives remaining   : 1017 (48.2 days at current dive duration)
    projected end date: 03-Jun-2014 19:38:45 (to 15% capacity)

High voltage pack usage


Low voltage pack usage