Shilshole 02Jul15 * SG161 * Dive index * Mission links
Based on high voltage useage over previous 2 dives:
    dives remaining   : 870 (32.4 days at current dive duration)
    projected end date: 04-Aug-2015 04:32:11 (to 15% capacity)

Based on low voltage useage over previous 2 dives:
    dives remaining   : 1548 (57.6 days at current dive duration)
    projected end date: 29-Aug-2015 09:39:05 (to 15% capacity)

High voltage pack usage


Low voltage pack usage