Shilshole 01Jul15.01 * SG161 * Dive index * Mission links
Based on high voltage useage over previous 3 dives:
    dives remaining   : 765 (22.4 days at current dive duration)
    projected end date: 24-Jul-2015 06:28:42 (to 15% capacity)

Based on low voltage useage over previous 3 dives:
    dives remaining   : 1564 (45.7 days at current dive duration)
    projected end date: 16-Aug-2015 15:24:21 (to 15% capacity)

High voltage pack usage


Low voltage pack usage