Shilshole 19Aug10 * SG160 * Dive index * Mission links
Based on high voltage useage over previous 5 dives:
    dives remaining   : 1252 (35.9 days at current dive duration)
    projected end date: 24-Sep-2010 17:31:10 (to 5% capacity)

High voltage pack usage


Low voltage pack usage