Shilshole 02Jun15 * SG157 * Dive index * Mission links
Based on high voltage useage over previous 10 dives:
    dives remaining   : 1809 (82.7 days at current dive duration)
    projected end date: 25-Aug-2015 08:33:12 (to 15% capacity)

Based on low voltage useage over previous 10 dives:
    dives remaining   : 1836 (83.9 days at current dive duration)
    projected end date: 26-Aug-2015 14:10:53 (to 15% capacity)

High voltage pack usage


Low voltage pack usage