Shilshole 28Mar16 * SG156 * Dive index * Mission links
Based on low voltage useage over previous 10 dives:
    dives remaining   : 1464 (62.4 days at current dive duration)
    projected end date: 31-May-2016 01:33:15 (to 15% capacity)

Based on high voltage useage over previous 10 dives:
    dives remaining   : 1561 (66.5 days at current dive duration)
    projected end date: 04-Jun-2016 04:48:05 (to 15% capacity)

High voltage pack usage


Low voltage pack usage