SvinoySection Sep09 * SG140 * Dive index * Mission links
Based on low voltage useage over previous 10 dives:
    dives remaining   : 300 (21.9 days at current dive duration)
    projected end date: 28-Feb-2010 21:33:24 (to 5% capacity)

High voltage pack usage


Low voltage pack usage