OKMC Mar12 * SG140 * Dive index * Mission links
Based on high voltage useage over previous 10 dives:
    dives remaining   : 543 (107.0 days at current dive duration)
    projected end date: 30-Jun-2012 06:03:22 (to 5% capacity)

Based on low voltage useage over previous 10 dives:
    dives remaining   : 631 (124.4 days at current dive duration)
    projected end date: 17-Jul-2012 14:18:48 (to 5% capacity)

High voltage pack usage


Low voltage pack usage