Shilshole 28Mar16 * SG130 * Dive index * Mission links
Based on high voltage useage over previous 10 dives:
    dives remaining   : 1321 (51.1 days at current dive duration)
    projected end date: 19-May-2016 18:02:09 (to 15% capacity)

Based on low voltage useage over previous 10 dives:
    dives remaining   : 1618 (62.6 days at current dive duration)
    projected end date: 31-May-2016 05:46:32 (to 15% capacity)

High voltage pack usage


Low voltage pack usage