Shilshole 17Jul13 * SG125 * Dive index * Mission links
Based on low voltage useage over previous 6 dives:
    dives remaining   : 1278 (43.0 days at current dive duration)
    projected end date: 29-Aug-2013 21:16:06 (to 5% capacity)

Based on high voltage useage over previous 6 dives:
    dives remaining   : 1329 (44.7 days at current dive duration)
    projected end date: 31-Aug-2013 14:25:47 (to 5% capacity)

High voltage pack usage


Low voltage pack usage