Taiwan17 Mar17 * SG124 * Dive index * Mission links
Based on low voltage useage over previous 10 dives:
    dives remaining   : 1145 (62.5 days at current dive duration)
    projected end date: 20-May-2017 15:46:47 (to 15% capacity)

Based on low voltage useage over previous 10 dives:
    dives remaining   : 1145 (62.5 days at current dive duration)
    projected end date: 20-May-2017 15:46:47 (to 15% capacity)

High voltage pack usage


Low voltage pack usage