Shilshole 26Jan12 * SG123 * Dive index * Mission links
Based on high voltage useage over previous 4 dives:
    dives remaining   : 1166 (33.6 days at current dive duration)
    projected end date: 29-Feb-2012 13:15:13 (to 5% capacity)

Based on low voltage useage over previous 4 dives:
    dives remaining   : 2308 (66.4 days at current dive duration)
    projected end date: 02-Apr-2012 10:20:38 (to 5% capacity)

High voltage pack usage


Low voltage pack usage