Taiwan17 Mar17 * SG122 * Dive index * Mission links
Based on low voltage useage over previous 10 dives:
    dives remaining   : 730 (74.8 days at current dive duration)
    projected end date: 22-May-2017 16:32:52 (to 15% capacity)

Based on low voltage useage over previous 10 dives:
    dives remaining   : 730 (74.8 days at current dive duration)
    projected end date: 22-May-2017 16:32:52 (to 15% capacity)

High voltage pack usage


Low voltage pack usage