Shilshole 08May14 * SG121 * Dive index * Mission links
Based on low voltage useage over previous 7 dives:
    dives remaining   : 71 (2.4 days at current dive duration)
    projected end date: 11-May-2014 07:12:45 (to 15% capacity)

Based on high voltage useage over previous 7 dives:
    dives remaining   : 2086 (69.8 days at current dive duration)
    projected end date: 17-Jul-2014 18:24:33 (to 15% capacity)

High voltage pack usage


Low voltage pack usage