PortSusan 02Aug07 * SG118 * Dive index * Mission links
Based on low voltage useage over previous 10 dives:
    dives remaining   : 142 (6.0 days at current dive duration)
    projected end date: 29-Aug-2007 15:30:21 (to 5% capacity)

High voltage pack usage


Low voltage pack usage