PLUS INP Jul09 * SG118 * Dive index * Mission links
Based on low voltage useage over previous 10 dives:
    dives remaining   : 308 (28.0 days at current dive duration)
    projected end date: 03-Sep-2009 01:17:51 (to 5% capacity)

High voltage pack usage


Low voltage pack usage