PLUS INP 31Jul08 * SG118 * Dive index * Mission links
Based on low voltage useage over previous 10 dives:
    dives remaining   : 605 (39.6 days at current dive duration)
    projected end date: 11-Sep-2008 18:08:04 (to 5% capacity)

High voltage pack usage


Low voltage pack usage