PortSusan 04Apr12 * SG116 * Dive index * Mission links
Based on high voltage useage over previous 5 dives:
    dives remaining   : 2040 (40.8 days at current dive duration)
    projected end date: 15-May-2012 15:19:06 (to 5% capacity)

Based on low voltage useage over previous 5 dives:
    dives remaining   : 2135 (42.7 days at current dive duration)
    projected end date: 17-May-2012 12:56:03 (to 5% capacity)

High voltage pack usage


Low voltage pack usage