Shilshole 07Mar12 * SG106 * Dive index * Mission links
Based on low voltage useage over previous 5 dives:
    dives remaining   : 571 (16.5 days at current dive duration)
    projected end date: 24-Mar-2012 08:33:18 (to 5% capacity)

Based on high voltage useage over previous 5 dives:
    dives remaining   : 617 (17.8 days at current dive duration)
    projected end date: 25-Mar-2012 16:21:59 (to 5% capacity)

High voltage pack usage


Low voltage pack usage