Shilshole 04Apr12 * SG106 * Dive index * Mission links
Based on low voltage useage over previous 4 dives:
    dives remaining   : 1791 (39.0 days at current dive duration)
    projected end date: 13-May-2012 19:47:19 (to 5% capacity)

Based on high voltage useage over previous 4 dives:
    dives remaining   : 1856 (40.4 days at current dive duration)
    projected end date: 15-May-2012 05:45:36 (to 5% capacity)

High voltage pack usage


Low voltage pack usage