Shilshole 26Feb15 * SG130 * Dive index * Mission links * Dive 9 * Raw log
prev dive * next dive * dive
• Previous call tries 1 • 1.95 of 92.00 AH used of 24V (97.88% remains)
• Previous NAKs 0, Timeouts 0 • 1.74 of 97.00 AH used of 10V (98.21% remains)
• Surface angle -76.4 deg, depth -0.37 m • Intended pitch -28.8 deg, speed -10.000 cm/s
VBD pumped to 150.12 (SM_CC=150)
• GPS1 time: 28 s
• GPS2 time: 10 s, HDOP was 2.2 m • Transponder ping count: 0
• Time spent turning 0 s

Statistics * Plot
t(s) depth(m) w(cm/s) num pts t(s) GC phase pitch roll VBD pit rol VBD volts
ctl(cm) t(s) A pos(AD) rate t(s) A pos(AD) rate ctl(cc) t(s) A pos(AD) rate eff r e r e r e pitrollvbd flags
13 end surface: CONTROL_FINISHED_OK
13 begin dive
16 - - - 30 VBD -1.75 - - 600 - - - 1937 - -4.9 -11.75 - 2003 - - - - - - - - - - -
33 2.3 -8.3 2 62 roll -1.75 9.12 0.177 2235 179.3 2.42 0.064 3395 602.5 -4.9 -13.45 - 2324 -23.9 - - - - - - - 25.46 25.81 26.12
306 end dive: TARGET_DEPTH_EXCEEDED
306 begin apogee
314 30.2 -10.0 55 322 done -0.30 1.75 0.179 2550 180.0 0.10 0.099 2002 -13930.0 - 1.83 0.047 2304 -10.9 0.678 - - - - - - 25.44 25.84 25.88
323 end apogee: CONTROL_FINISHED_OK
323 begin climb
325 29.1 - 56 338 roll 1.75 2.53 0.180 2999 177.5 2.42 0.043 536 -605.8 4.9 1.90 0.047 2285 -10.0 0.598 - - - - - - 25.46 25.86 25.88
581 end climb: SURFACE_DEPTH_REACHED
581 begin surface coast
612 end surface coast: CONTROL_FINISHED_OK
612 begin surface
SM -0.33 - - - - -9.27 10.70 0.068 599 56.0 2.38 0.035 2000 -3679.0 150.12 57.88 0.047 1693 29.2 0.021 - - - - - -