PortSusan 28Jun07 * SG001 * Dive index * Mission links * Dive 9 * Raw log
prev dive * next dive * dive
• Previous call tries 1 • 10.23 of 91.80 AH used of 24V (88.85% remains)
• Previous NAKs 0, Timeouts 0 • 1.50 of 61.20 AH used of 10V (97.55% remains)
• Surface angle -50.0 deg, depth 0.34 m • Intended pitch -20.0 deg, speed -10.000 cm/s
VBD pumped to 375.06 (SM_CC=375) • surface range 9.3 m at 9.6 m depth, ceiling 0.3 m
• GPS1 time: 21 s • bottom range 29.9 m at 75.2 m, depth 105 m (100 m grid)
• GPS2 time: 18 s • Transponder ping count: -1
• Time spent turning 0 s

Statistics * Plot
t(s) depth(m) w(cm/s) num pts t(s) GC phase pitch roll VBD pit rol VBD volts
ctl(cm) t(s) A pos(AD) rate t(s) A pos(AD) rate ctl(cc) t(s) A pos(AD) rate eff r e r e r e pitrollvbd flags
38 end surface: CONTROL_FINISHED_OK
38 begin dive
44 - - - 120 done -1.21 - - 629 - - - 2098 - -121.6 -67.03 - 2761 - - - - - - - - - - -
126 2.9 -6.2 10 143 roll -1.21 6.88 - 2044 205.7 2.50 - 417 -672.4 -121.6 - - 2762 - - - - - - - - - - -
415 35.6 -11.0 57 424 done -1.21 0.35 - 1956 -251.4 3.12 - 2196 570.2 -121.6 - - 2766 - - - - - - - - - - -
787 76.1 -11.1 118 796 roll -1.21 0.50 - 2019 126.0 2.30 - 3596 608.7 -121.6 - - 2763 - - - - - - - - - - -
1018 end dive: TARGET_DEPTH_EXCEEDED
1018 begin apogee
1034 100.4 9.9 156 1148 done -0.25 1.12 - 2281 233.9 - - 1824 - - 99.57 - 2268 -5.0 - - - - - - - - - -
1149 end apogee: CONTROL_FINISHED_OK
1149 begin climb
1155 107.9 - 162 1267 roll 1.21 1.17 - 2551 230.8 2.72 - 383 -529.8 121.6 98.53 - 1762 -5.1 - - - - - - - - - -
1537 70.2 11.7 205 1546 done 1.21 0.10 - 2504 -470.0 3.75 - 2188 481.3 121.6 - - 1762 - - - - - - - - - - -
1907 27.5 11.0 266 1915 roll 1.21 0.05 - 2516 240.0 2.72 - 455 -637.1 121.6 - - 1766 - - - - - - - - - - -
2147 end climb: SURFACE_DEPTH_REACHED
2147 begin surface coast
2175 end surface coast: CONTROL_FINISHED_OK
2175 begin surface
SM 0.34 - - - - -7.45 - - 635 - - - 2078 - 375.06 158.77 - 741 -6.5 INF - - - - - -