PortSusan 09Jan08 * SG141 * Dive index * Mission links * Dive 7 * Raw log
prev dive * next dive * dive
• Previous call tries 5 • 1.18 of 91.80 AH used of 24V (98.72% remains)
• Previous NAKs 0, Timeouts 0 • 0.49 of 61.20 AH used of 10V (99.19% remains)
• Surface angle -65.9 deg, depth 0.89 m • Intended pitch -14.9 deg, speed -10.000 cm/s
VBD pumped to 725.35 (SM_CC=725.35211)
• GPS1 time: 8 s, HDOP was 4.0 m
• GPS2 time: 29 s • Transponder ping count: 187
• Time spent turning 0 s

Statistics * Plot
t(s) depth(m) w(cm/s) num pts t(s) GC phase pitch roll VBD pit rol VBD volts
ctl(cm) t(s) A pos(AD) rate t(s) A pos(AD) rate ctl(cc) t(s) A pos(AD) rate eff r e r e r e pitrollvbd flags
14 end surface: CONTROL_FINISHED_OK
14 begin dive
16 - - - 106 VBD -1.17 - - 572 - - - 2217 - -195.5 -88.15 - 2598 - - - - - - - - - - -
108 3.4 -7.0 12 162 roll -1.17 12.40 0.187 2754 176.0 2.65 0.078 3620 529.4 -195.5 -30.92 - 3958 -44.0 - - - - - - - - - -
397 26.0 -8.5 64 405 done -1.17 - - 2754 - 2.55 0.051 2220 -549.0 -195.5 - - 3962 - - - - - - - - - - -
472 32.4 -8.4 77 478 roll -1.17 - - 2754 - 2.60 0.065 806 -543.8 -195.5 - - 3962 - - - - - - - - - - -
561 40.4 -8.9 93 567 done -1.17 - - 2754 - 2.55 0.050 2218 553.7 -195.5 - - 3962 - - - - - - - - - - -
626 end dive: TARGET_DEPTH_EXCEEDED
626 begin apogee
630 46.4 8.9 105 734 done -0.31 0.90 0.105 2942 208.9 - - 2221 - - 99.40 0.704 3457 -5.1 0.035 - - - - - - - - -
735 end apogee: CONTROL_FINISHED_OK
735 begin climb
736 49.3 - 122 903 roll 1.17 1.48 0.087 3267 219.6 2.67 0.069 3615 522.1 195.5 154.55 0.670 2658 -5.2 0.039 - - - - - - - - -
1142 11.7 11.2 194 1150 done 1.17 - - 3267 - 2.55 0.056 2224 -545.5 195.5 - - 2657 - - - - - - - - - - -
1214 9.8 -0.7 207 1455 VBD 1.55 0.32 0.053 3352 265.6 - - 2220 - 504.3 237.05 0.637 1457 -5.1 0.008 - - - - - - - - -
1456 end climb: SURFACE_DEPTH_REACHED
1456 begin surface coast
1582 end surface coast: CONTROL_FINISHED_OK
1582 begin surface
SM 0.85 - - - - -11.23 - - 574 - - - 2218 - 725.35 177.18 0.603 500 -5.4 0.001 - - - - - -