Shilshole 05Apr12 * SG106 * Dive index * Mission links * Dive 6 * Raw log
prev dive * next dive * dive
• Previous call tries 2 • 5.71 of 150.00 AH used of 24V (96.19% remains)
• Previous NAKs 0, Timeouts 0 • 5.94 of 98.00 AH used of 10V (93.94% remains)
• Surface angle -1.4 deg, depth -0.82 m • Intended pitch -25.8 deg, speed -10.000 cm/s
VBD pumped to 150.12 (SM_CC=150)
• GPS1 time: 15 s
• GPS2 time: 13 s
• Time spent turning 0 s

Statistics * Plot
t(s) depth(m) w(cm/s) num pts t(s) GC phase pitch roll VBD pit rol VBD volts
ctl(cm) t(s) A pos(AD) rate t(s) A pos(AD) rate ctl(cc) t(s) A pos(AD) rate eff r e r e r e pitrollvbd flags
13 end surface: CONTROL_FINISHED_OK
13 begin dive
14 - - - 43 VBD -0.87 - - 127 - - - 2060 - -4.9 -27.00 - 3381 - - - - - - - - - - -
44 3.3 -9.0 3 63 roll -0.87 5.40 0.049 2123 369.6 2.55 0.076 657 -550.2 -4.9 -1.35 - 3413 -23.7 - - - - - - - 25.60 25.51 25.79
393 38.3 -10.0 50 405 done -0.87 - - 2123 - 2.40 0.044 2066 587.1 -4.9 - - 3414 - - - - - - - - - 25.60 -
464 end dive: TARGET_DEPTH_EXCEEDED
464 begin apogee
466 45.6 -10.1 59 478 done -0.17 0.57 0.056 2343 386.0 - - 111 - - 1.98 0.152 3387 -13.6 0.413 - - - - - - 25.57 - 25.42
484 end apogee: CONTROL_FINISHED_OK
484 begin climb
485 44.7 - 60 497 roll 0.87 0.93 0.073 2665 346.2 6.05 0.057 3471 555.4 4.9 1.35 0.167 3367 -14.8 0.400 - - 1 - - - 25.53 25.51 25.41
827 9.5 10.1 106 839 done 0.87 - - 2665 - 2.40 0.041 2061 -587.5 4.9 - - 3369 - - - - - - - - - 25.61 -
891 end climb: SURFACE_DEPTH_REACHED
891 begin surface coast
927 end surface coast: CONTROL_FINISHED_OK
927 begin surface
SM -0.82 - - - - -7.00 6.95 0.051 131 -364.6 - - 2061 - 150.12 49.05 0.117 2775 -12.1 -0.009 - - - - - -