PortSusan 05Sep07 * SG128 * Dive index * Mission links * Dive 541 * Raw log
prev dive * next dive * dive
• Previous call tries 1 • 49.49 of 150.00 AH used of 24V (67.01% remains)
• Previous NAKs 0, Timeouts 0 • 25.22 of 100.00 AH used of 10V (74.78% remains)
• Surface angle -65.1 deg, depth 1.01 m • Intended pitch -20.9 deg, speed -10.000 cm/s
VBD pumped to 649.06 (beyond SM_CC=400)
• GPS1 time: 12 s, HDOP was 2.4 m • bottom range 53.0 m at 65.2 m, depth 118 m (108 m grid)
• GPS2 time: 12 s • Transponder ping count: 0
• Time spent turning 0 s

Statistics * Plot
t(s) depth(m) w(cm/s) num pts t(s) GC phase pitch roll VBD pit rol VBD volts
ctl(cm) t(s) A pos(AD) rate t(s) A pos(AD) rate ctl(cc) t(s) A pos(AD) rate eff r e r e r e pitrollvbd flags
23 end surface: CONTROL_FINISHED_OK
23 begin dive
27 - - - 131 VBD -1.30 - - 20 - - - 2353 - -112.4 -101.45 - 2884 - - - - - - - - - - -
135 3.8 -10.5 19 159 roll -1.30 9.07 0.203 2295 250.8 2.28 0.046 948 -616.2 -112.4 -7.68 - 3309 -55.3 - - - - - - - - - -
464 60.9 -15.9 55 468 done -1.30 - - 2286 - 2.28 0.033 2357 618.0 -112.4 - - 3312 - - - - - - - - - - -
649 end dive: TARGET_DEPTH_EXCEEDED
649 begin apogee
657 90.7 16.4 72 747 done -0.28 1.10 0.126 2621 304.5 - - 2138 - - 86.15 0.752 2849 -5.4 0.065 - - - - - - - - -
748 end apogee: CONTROL_FINISHED_OK
748 begin climb
751 96.0 - 81 844 roll 1.30 1.55 0.077 3131 329.0 2.45 0.041 3556 578.8 112.4 85.60 0.695 2390 -5.4 0.074 - - - - - - - - -
1079 end climb: NO_VERTICAL_VELOCITY
1079 begin surface
SM 1.04 - - - - -8.39 9.15 0.056 15 -340.5 - - 2356 - 651.76 - - 193 - - - - - - - -