OceanStationM Jul08 * SG017 * Dive index * Mission links * Dive 497 * Raw log
prev dive * next dive * dive
• Previous call tries 1 • 63.88 of 91.80 AH used of 24V (30.41% remains)
• Previous NAKs 0, Timeouts 0 • 51.34 of 61.20 AH used of 10V (16.11% remains)
• Surface angle -47.5 deg, depth 0.82 m • Intended pitch -15.5 deg, speed -10.000 cm/s
VBD pumped to 250.21 (SM_CC=250)
• GPS1 time: 9 s
• GPS2 time: 41 s • Transponder ping count: -1
• Time spent turning 0 s

Statistics * Plot
t(s) depth(m) w(cm/s) num pts t(s) GC phase pitch roll VBD pit rol VBD volts
ctl(cm) t(s) A pos(AD) rate t(s) A pos(AD) rate ctl(cc) t(s) A pos(AD) rate eff r e r e r e pitrollvbd flags
25 end surface: CONTROL_FINISHED_OK
25 begin dive
29 - - - 92 done -1.45 - - 55 - - - 2109 - -145.9 -60.70 - 3388 - - - - - - - - - - -
96 5.2 -8.4 2 110 roll -1.45 9.40 0.179 1642 168.8 1.98 0.044 1002 -559.1 -145.9 - - 3391 - - - - - - - - - - -
117 15.2 -38.0 2 121 done -1.45 - - 1642 - 2.00 0.035 2127 562.5 -145.9 - - 3392 - - - - - - - - - - -
454 56.4 -11.4 11 458 roll -1.45 - - 1642 - 2.00 0.046 1010 -558.5 -145.9 - - 3393 - - - - - - - - - - -
640 end dive: TARGET_DEPTH_EXCEEDED
640 begin apogee
648 75.4 10.4 15 770 done -0.42 1.08 0.089 1870 211.1 - - 2020 - - 118.32 0.697 2791 -5.1 0.058 - - - - - - - - -
771 end apogee: CONTROL_FINISHED_OK
771 begin climb
774 78.7 - 18 902 roll 1.45 1.90 0.059 2281 216.3 2.17 0.054 3126 509.7 145.9 115.50 0.676 2196 -5.2 0.063 - - - - - - - - -
1047 56.9 13.3 24 1051 done 1.45 - - 2281 - 1.98 0.036 2018 -559.6 145.9 - - 2196 - - - - - - - - - - -
1360 17.0 12.7 32 1364 roll 1.45 - - 2282 - 2.08 0.051 3129 534.1 145.9 - - 2195 - - - - - - - - - - -
1402 11.8 12.7 33 1406 done 1.45 - - 2282 - 2.00 0.038 2011 -559.0 145.9 - - 2195 - - - - - - - - - - -
1480 end climb: SURFACE_DEPTH_REACHED
1480 begin surface coast
1522 end surface coast: CONTROL_FINISHED_OK
1522 begin surface
SM 0.73 - - - - -8.78 - - 57 - - - 2141 - 250.21 60.75 0.640 1771 -7.0 0.001 - - - - - -