ITOP Sep10 * SG169 * Dive index * Mission links * Dive 479 * Raw log
prev dive * next dive * dive
• Previous call tries 1 • 76.67 of 150.00 AH used of 24V (48.89% remains)
• Previous NAKs 0, Timeouts 0 • 61.61 of 110.00 AH used of 10V (43.99% remains)
• Surface angle -71.7 deg, depth 1.68 m • Intended pitch -20.0 deg, speed -14.286 cm/s
VBD pumped to 640.23 (SM_CC=640)
• GPS1 time: 13 s, HDOP was 3.3 m
• GPS2 time: 15 s • Transponder ping count: 0
• Time spent turning 0 s

Statistics * Plot
t(s) depth(m) w(cm/s) num pts t(s) GC phase pitch roll VBD pit rol VBD volts
ctl(cm) t(s) A pos(AD) rate t(s) A pos(AD) rate ctl(cc) t(s) A pos(AD) rate eff r e r e r e pitrollvbd flags
14 end surface: CONTROL_FINISHED_OK
14 begin dive
17 - - - 115 VBD -0.70 - - 130 - - - 1981 - -204.4 -96.07 - 3031 - - - - - - - - - - -
118 3.5 -3.4 12 152 roll -0.70 9.68 0.233 2494 244.2 1.70 0.068 881 -647.1 -204.4 -17.42 - 3927 -51.4 - - - - - - - - - -
337 61.3 -22.6 47 346 done -0.69 - - 2493 - 1.80 0.053 2035 641.1 -204.4 - - 3926 - - - - - - - - - - -
589 end dive: TARGET_DEPTH_EXCEEDED
589 begin apogee
595 120.9 21.8 89 757 done -0.18 0.57 0.159 2667 305.3 0.10 0.096 2078 430.0 - 154.02 0.577 3090 -5.4 0.113 - - - - - - - - -
758 end apogee: CONTROL_FINISHED_OK
759 begin climb
761 132.1 - 109 937 roll 0.70 0.82 0.114 2947 341.5 1.70 0.037 970 -651.8 204.4 161.38 0.579 2254 -5.2 0.118 - - - - - - - - -
1057 125.6 7.5 150 1179 done 0.88 0.12 0.040 3028 675.0 1.75 0.030 2168 684.6 349.0 112.43 0.566 1667 -5.2 0.116 - - - - - - - - -
1532 67.9 10.3 225 1605 roll 0.98 - - 3028 - 1.67 0.033 3282 667.1 433.4 66.75 0.529 1322 -5.2 0.066 - - - - - - - - -
1647 55.1 12.3 240 1689 done 1.04 0.08 0.050 3094 825.0 1.80 0.031 2084 -665.6 476.4 34.95 0.513 1148 -5.0 0.053 - - - - - - - - -
1924 end climb: SURFACE_DEPTH_REACHED
1924 begin surface coast
1944 end surface coast: CONTROL_FINISHED_OK
1944 begin surface
SM 1.67 - - - - -8.06 - - 151 - - - 1982 - 640.23 110.57 0.052 481 -6.0 0.020 - - - - - -