Shilshole 09May23 * SG235 * Dive index * Mission links * Dive 4 * Raw log
prev dive * next dive * dive
• Previous call tries 1 • 0.83 of 575.00 AH used of 24V (99.86% remains)
• Surface angle -30.2 deg, depth 1.72 m • Intended pitch -19.3 deg, speed -10.000 cm/s
VBD pumped to 463.87 (SM_CC=463.617)
• GPS1 time: 1 s
• GPS2 time: 2 s
• Time spent turning 0 s

Statistics * Plot
t(s) depth(m) w(cm/s) num pts t(s) GC phase pitch roll VBD pit rol VBD volts
ctl(cm) t(s) A pos(AD) rate t(s) A pos(AD) rate ctl(cc) t(s) A pos(AD) rate eff r e r e r e pitrollvbd flags
8 end surface: CONTROL_FINISHED_OK
8 begin dive
9.27 - - - 130.13 VBD -1.12 - - 231.12 - - - 2728.50 - -146.63 118.34 0.005 3535.47 - - - - - - - - - - 16.10
130.45 3.80 -1.88 12 174.13 -1.12 20.07 0.227 2932.25 134.6 3.44 0.112 1275.38 -422.4 -146.63 7.48 0.008 3797.78 35.1 -2.746 - - - - - - 15.90 15.99 16.10
241.65 16.05 -20.77 33 249.00 roll back -0.96 0.22 0.094 2979.75 215.9 3.38 0.065 2772.50 442.9 -146.63 - - 3799.25 - - - - - - - - 16.01 16.03 -
497 end dive: TARGET_DEPTH_EXCEEDED
497 begin apogee
498.82 63.05 -18.07 47 603.35 -0.14 1.15 0.081 3172.19 167.3 0.09 0.191 2631.88 -1562.4 - 98.94 0.892 3197.69 -6.1 0.071 - - - - - - 16.06 15.78 11.25
605 end apogee: CONTROL_FINISHED_OK
605 begin climb
605.72 78.48 - 50 720.69 1.12 1.83 0.082 3477.94 167.1 3.33 0.106 4010.25 413.9 146.63 104.29 0.872 2597.38 -5.8 0.085 - - - - - - 15.79 15.60 11.40
723.21 70.30 20.36 64 730.09 roll back 1.63 0.75 0.086 3601.06 164.2 3.36 0.062 2574.00 -427.5 146.63 - - 2596.81 - - - - - - - - 15.63 15.66 -
899 end climb: SURFACE_DEPTH_REACHED
899 begin surface coast
909 end surface coast: CONTROL_FINISHED_OK
909 begin surface
SM 1.74 - - - - 217.4 231.38 0.793 1309.0 5.7 23.08 0.166 1232.1 53.4 - 0.41 0.085 1385.8 3371.8 -7.055 - - 11.40 15.73 15.85 -